Monday, 9 November 2009
Rear end work
Handbrake cable installed
Today I installed the handbrake cable a threaded it though the holes in the chassis in front of the diff. I now need to fix it permanently in place once I am happy with the exact location. I need really to have the fuel tank in place so I can make sure it is in the right place. The fuel tank is on order.
Tuesday, 20 October 2009
Diff mounted in chassis
It took me some time to work out what to use to mount the diff on the diff mountings on the chassis. The manual said either use 220mm M12 bolts or threaded bar. Therefore after much debate I decided to pop to screwfix and buy some threaded M12 bar. I got back and cut this to size ready to install. The installation proved quite hard as the diff is quite heavy and so needed a few persuasions from the old rubber mallet to get the threaded bar through. Anyway it is now bolted in safe and sound and looks great.
Rear suspension fitted
I spent almost all day on Sunday in the garage and after many hours it didn't look like I had achieved much. However I did manage to build up the rear suspension, and the pictures show this. The only thing left to go on are the shocks and the drive shaft through the hole in the rear hub. What didn't help on the near side was the fact that MK had given me a bolt which was too short so I need to call them to get another. Therfore I used the shortened bolt until the new one comes.
Saturday, 17 October 2009
New brake drums
Diff now finished
Subscribe to:
Posts (Atom)