Sunday, 4 October 2009

Its been a while - steering rack added


Its been a while since i worked on the car the summer has gone, and due to holidays, illness and enjoying ourselves most weekends I haven't had the time to work on the car. I decided that this sat I would dedicate a day to working on the car and managed to do a number of things. Firstly I cleaned up the steering rack and installed this. Then I did some pre planning and worked out a shopping list for the coming phases of the build. I then thought I would install the diff and I undid the plug and drained the diff of oil and the rubbish that has been in it and at this point I noticed it was leaking quite a lot of oil to the underneath ofthe diff. After some thought I decided that I either needed a diff that wasn't going to leak or I need to recondition the diff I have. I am currently researching what to do on this as there are diff recondition packs you can buy and I think this would be the best option.

Thursday, 16 July 2009

More brake pipes


A further image of the brake pipe install.

Brake pipe install


Mark came over tonight and after having a look at the new loom from premier wiring that came today we set about fixing the brake pipes to the master cylinder and then attaching them to the chassis via the brake pipe clips. 6mm holes were drilled for this and then the clip inserted into the hole with the pipe then fixing into this. We then had to use the brake pipe bender (what a gadget) to bend the pipes in the relevant directions to make a neat and tidy job. I found I was missing some pipes on the rear so will need to contact MK to get these ordered. I still have some further work to do to P clip some of the pipes, which I will do this weekend.

Saturday, 11 July 2009

New brake drum shoes purchased


I have decided to refurb the rear brakes before I fit them and ordered new brake shoes to go inside. I ordered them from euro car parts and I got a set of 4 for £24 which I was pleased with. The picture shows one of the new shoes ontop of the drum.

Brake drums cleaned up


I spent some time clearning up the brake drums and finished off by painting them. I also need to refurb them ready for going onto the car.

A bit of cleaning and some donor part refurb


I spent some time today cleaning up the front hubs and also the rear brake drums and axles. I cleaned them up and then painted them

Sunday, 5 July 2009

Floor on and riveted


This weekend I finished the floor but it didn't go as smoothly as I had wanted it to.
I started by putting the sealant onto the chassis and then lowered the floor onto it, lined it up and then put the rivets into the holes ready to rivet it. I got my lazy tongue riveter out to use and on the first rivet it broke. It just would not spit out the rivet redundant part. I then had to make a decision either to carry on and use a hand riveter instead to rivet the whole floor before the sealant went off or go and get another lazy tongue riveter from somewhere. I thought I would use the hand riveter but after having done about 20 rivets (my my hands shaking from the effort required),on a boiling hot day I gave up and quickly visited machine mart in Bristol and bought another lazy tongue riveter. I managed to then use this to complete the job. The picture shows all the rivets inserted at gaps of around 5 cm's.