Monday, 22 June 2009
Floor continued
I was joined in the garage today by Mark a friend who has built his own MK Indy blade recently and I really appreciated his advice and guidance. We both worked on getting the floor attached by continuing the prep work needed to do this.
Next we placed the aluminium floor on top of the chassis and clamped it in place. We then drilled 3mm holes in the floor into the chassis (every. Once we had done this we then increased the size of the holes to 5mm with a larger drill bit. We then went round each hole and got rid of any rough edges from the holes.
We also drilled 3mm holes in the transmission tunnel and various other areas which would be hard to get to once the floor was in place. This was an excellent piece of advice from Mark, thanks Mark.
Now its time to attach the rivets and get it attached.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment