Monday, 9 November 2009
Rear end work
Handbrake cable installed
Today I installed the handbrake cable a threaded it though the holes in the chassis in front of the diff. I now need to fix it permanently in place once I am happy with the exact location. I need really to have the fuel tank in place so I can make sure it is in the right place. The fuel tank is on order.
Tuesday, 20 October 2009
Diff mounted in chassis
It took me some time to work out what to use to mount the diff on the diff mountings on the chassis. The manual said either use 220mm M12 bolts or threaded bar. Therefore after much debate I decided to pop to screwfix and buy some threaded M12 bar. I got back and cut this to size ready to install. The installation proved quite hard as the diff is quite heavy and so needed a few persuasions from the old rubber mallet to get the threaded bar through. Anyway it is now bolted in safe and sound and looks great.
Rear suspension fitted
I spent almost all day on Sunday in the garage and after many hours it didn't look like I had achieved much. However I did manage to build up the rear suspension, and the pictures show this. The only thing left to go on are the shocks and the drive shaft through the hole in the rear hub. What didn't help on the near side was the fact that MK had given me a bolt which was too short so I need to call them to get another. Therfore I used the shortened bolt until the new one comes.
Saturday, 17 October 2009
New brake drums
Diff now finished
More reconditioning
Tuesday, 6 October 2009
New parts ordered
Today I ordered the replacement brake drum parts that I need. I ordered new drums and slave cylinders and also new CV joints to replace the existing ones I have that are shot.
I have also spoken to MK and will be ordering a radiator and brackets.
I have also ordered some shim washers and various size P clips for attaching the final parts of the brake pipes. Just need to wait for all of it to come now...
I have also spoken to MK and will be ordering a radiator and brackets.
I have also ordered some shim washers and various size P clips for attaching the final parts of the brake pipes. Just need to wait for all of it to come now...
Sunday, 4 October 2009
Brake drums inspection
I decided to take the brake drums apart to see what condition the shoes and the slave cylinder were in so I carefully took it apart and decided that I would be better off changing the shoes (already bought some replacements) and also the drum was in a rough state covered in rust so for the sake of £30 I could get some new ones. I also decided that the slave cylinder needed changing and so took this out. I will pop down euro car parts this week to order up some new ones so i can fully refurbish the drum brakes. The picture shows the back plate with the contents of the drum brakes taken out.
Its been a while - steering rack added
Its been a while since i worked on the car the summer has gone, and due to holidays, illness and enjoying ourselves most weekends I haven't had the time to work on the car. I decided that this sat I would dedicate a day to working on the car and managed to do a number of things. Firstly I cleaned up the steering rack and installed this. Then I did some pre planning and worked out a shopping list for the coming phases of the build. I then thought I would install the diff and I undid the plug and drained the diff of oil and the rubbish that has been in it and at this point I noticed it was leaking quite a lot of oil to the underneath ofthe diff. After some thought I decided that I either needed a diff that wasn't going to leak or I need to recondition the diff I have. I am currently researching what to do on this as there are diff recondition packs you can buy and I think this would be the best option.
Thursday, 16 July 2009
Brake pipe install
Mark came over tonight and after having a look at the new loom from premier wiring that came today we set about fixing the brake pipes to the master cylinder and then attaching them to the chassis via the brake pipe clips. 6mm holes were drilled for this and then the clip inserted into the hole with the pipe then fixing into this. We then had to use the brake pipe bender (what a gadget) to bend the pipes in the relevant directions to make a neat and tidy job. I found I was missing some pipes on the rear so will need to contact MK to get these ordered. I still have some further work to do to P clip some of the pipes, which I will do this weekend.
Saturday, 11 July 2009
New brake drum shoes purchased
Brake drums cleaned up
A bit of cleaning and some donor part refurb
Sunday, 5 July 2009
Floor on and riveted
This weekend I finished the floor but it didn't go as smoothly as I had wanted it to.
I started by putting the sealant onto the chassis and then lowered the floor onto it, lined it up and then put the rivets into the holes ready to rivet it. I got my lazy tongue riveter out to use and on the first rivet it broke. It just would not spit out the rivet redundant part. I then had to make a decision either to carry on and use a hand riveter instead to rivet the whole floor before the sealant went off or go and get another lazy tongue riveter from somewhere. I thought I would use the hand riveter but after having done about 20 rivets (my my hands shaking from the effort required),on a boiling hot day I gave up and quickly visited machine mart in Bristol and bought another lazy tongue riveter. I managed to then use this to complete the job. The picture shows all the rivets inserted at gaps of around 5 cm's.
Monday, 22 June 2009
Floor continued
I was joined in the garage today by Mark a friend who has built his own MK Indy blade recently and I really appreciated his advice and guidance. We both worked on getting the floor attached by continuing the prep work needed to do this.
Next we placed the aluminium floor on top of the chassis and clamped it in place. We then drilled 3mm holes in the floor into the chassis (every. Once we had done this we then increased the size of the holes to 5mm with a larger drill bit. We then went round each hole and got rid of any rough edges from the holes.
We also drilled 3mm holes in the transmission tunnel and various other areas which would be hard to get to once the floor was in place. This was an excellent piece of advice from Mark, thanks Mark.
Now its time to attach the rivets and get it attached.
Subscribe to:
Posts (Atom)
